We are proud to share the construction of No. 2 hot-dip galvanized steelwork fire escapes.
This work was completed with great attention to detail, including the Calculation Report, Structural Graphic Tables and REI 30′ Certification (30-minute fire resistance), in full compliance with current regulations.
Every phase of the work was carried out with the utmost precision and professionalism, from design to final assembly.